Our Location
No.503 Xingguo Road, Yuhang Economic and
Technological Development Zone, Hangzhou






This single-phase energy meter test equipment is designed for utilities, meter manufacturers and laboratories that test and calibrate active and reactive meters. Configurable meter positions support different laboratory and production capacities.
These values apply to this single-phase product and do not use specifications from the SY8330E three-phase model.
Select the number of positions according to expected throughput, meter connection method and available floor space. Confirm the required voltage/current range, meter type, test procedures and local mains supply before quotation.
The current product page lists configurations with 6, 12, 24, 32, 48 or 60 positions. Confirm the final arrangement with SONGYANG because capacity and cabinet layout vary by project.
Consider daily test volume, test duration, operator workflow, available space and the required meter connection system. A larger bench improves parallel throughput but also changes power, space and handling requirements.
Discuss single-phase meter testing on WhatsApp
Explore stationary energy meter test benches | Compare the SY8330E three-phase test bench
{“@context”:”https://schema.org”,”@type”:”Product”,”@id”:”https://energymeterinc.com/product/single-phase-meter-test-equipment-mte/#product”,”name”:”Single Phase Energy Meter Test Equipment”,”description”:”Explore single-phase energy meter test equipment for meter testing and calibration. Contact SONGYANG on WhatsApp to discuss your configuration.”,”url”:”https://energymeterinc.com/product/single-phase-meter-test-equipment-mte/”,”image”:”https://energymeterinc.com/wp-content/uploads/2023/09/SY8125.webp”,”brand”:{“@type”:”Brand”,”name”:”SONGYANG”},”mpn”:”SY8125E”}