Our Location

304 North Cardinal St.
Dorchester Center, MA 02124

SY2103H Three Phase Energy Meter Testing Equipment

Meter Testing Equipment Features
  • Accuracy class 0.05
  • Stability 200ppm
  • Amplitude accuracy 0.05%
  • Measuring range: 60V-480V, 10mA-120A
  • Positions 3
  • Smart meter commucation verication via DLMS protocol
  • Net weight 30kg

 

Comply IEC62057 Test equipment, techniques and procedures for electrical energy meters,  IEC62053 Electricity metering equipment,  DLMS (Device Language Message Specification) or COSEM (Companion Specification for Energy Metering).

 

●  Warm up                         ●  Basic error test                          ●  Standard deviation

●  Repeatable test              ●  Latent test (no load)                 ● Initial test (starting test)

●  Voltage influence          ●  Frequency influence                 ●  Deviation test for 24 hours

●  Harmonic test               ●  Unbalance voltage test              ●  Unbalance current test